AI Visibility for Kitchen Remodelers in Orlando, FL
Short answer
One sampled answer named a single firm, and it marked that name unverified. Phil Kean Design Group in Winter Park appears in 1 of 2 answers. Vizaeo asked two English buyer questions on 2026-10-22 and tallied every name from the raw answers.
The AI Visibility Index: kitchen remodelers in Orlando
Vizaeo asked two English questions on 2026-10-22, so every count below is out of 2. claude-vizaeo answered who the best kitchen remodelers in Orlando are, and why. grok answered how to choose one, what to avoid, and what jobs there usually cost. The session blocked search, so the naming answer used training memory. The choosing answer used Florida statutes, the City of Orlando permit page, and 2026 price guides.
Who the models name
Phil Kean Design Group in Winter Park: named in 1 of 2, the naming answer only. That answer calls the firm a high-end, architect-led design-build practice with a reputation for full custom kitchens. The name comes from training data, not a source checked that day. The answer says to confirm that the firm still operates and still takes remodels.
The choosing answer named no remodeler.
Where the models send clients
- myfloridalicense.com, the Florida DBPR lookup: 2 of 2.
- Houzz, filtered to Orlando kitchen and bath remodelers: 1 of 2, the naming answer.
- Google Maps and the Better Business Bureau: 1 of 2, the naming answer.
- Orange County or the City of Orlando as the permit office: 2 of 2.
- The City of Orlando permit steps on orlando.gov, and the city permit portal: 1 of 2, the choosing answer.
- The Orange County Comptroller, for a Notice of Commencement: 1 of 2, the choosing answer.
- Thumbtack, for a July 13, 2026 average the choosing answer calls a poor full-remodel budget: 1 of 2.
- The 2025 Cost vs. Value report: 1 of 2. The figures are national. That answer found no 2025 Orlando-only breakout.
What the models judge on
The choosing answer (1 of 2) cited Florida sections 489.105, 489.103(7), 489.126, and 713.06, plus Chapter 501, and drew its price ranges from unnamed 2026 Central Florida guides and one October 2026 cost model.
Both answers judge the license, the insurance, three written bids, recent kitchens, and who pulls the permit.
License: 2 of 2. The naming answer wants a certified or registered contractor when walls, plumbing, or electrical move. Skip a firm with no license or with open complaints. The choosing answer wants status Active, a business name that matches the quote, and a named qualifying agent. For a normal house it names three classes under section 489.105: Certified Residential, Certified Building, and Certified General. A building contractor stops where structural members start. The electrician and the plumber need their own licenses.
Insurance: 2 of 2. Both want general liability and workers' compensation. The choosing answer also accepts an exemption when the firm has no employees. It wants the insurance agent to email the certificate. Every sub on site needs coverage too.
Bids: 2 of 2. The naming answer wants 3 written bids and calls to 2 clients from the last 12 months. Compare cabinets, counters, demolition, electrical, plumbing, permits, and cleanup. The choosing answer wants three bids on one written scope, then two finished kitchens near the house.
Permits: 2 of 2. Both want the firm to pull the permit. The rest is choosing answer only (1 of 2). Inside the City of Orlando, a project over $5,000 needs a Notice of Commencement with the Orange County Comptroller before work starts. Post it, and copy the city. Another city, or unincorporated Orange County, uses that office's rules. A permit with no inspection for six months expires. As of July 1, 2026, some single-family work under $7,500 can be permit-exempt if the owner requests it. Electrical, plumbing, mechanical, gas, and structural work are not exempt. A moved sink, a new circuit, or a removed wall does not qualify.
Deposits conflict. The naming answer is wary above about 10 to 30 percent of the contract. The choosing answer says Florida sets no flat cap. Under section 489.126, a first payment over 10 percent starts a clock. Apply for permits within 30 days. Start within 90 days after those permits issue, unless the client agrees in writing to more time. That answer walks away from a third or a half before demolition.
Reviews, naming answer only. Keep a 4.7 star average or better across at least 50 reviews. Read the 1-star to 3-star notes.
Price, choosing answer only. These are 2026 planning ranges, not a bid. A refresh is $10,000 to $30,000. A mid-range replacement that keeps the layout is $25,000 to $70,000. Custom work or a layout change is $65,000 to $150,000 and higher. Thumbtack's July 13, 2026 average is $3,337 to $14,221. National 2025 Cost vs. Value figures are about $28,500, about $83,000, and about $164,000.
Other walk-aways, choosing answer only. Skip an owner-builder permit. Hold the last check for the final payment affidavit under section 713.06.
How to improve your AI visibility as a kitchen remodeler in Orlando
Publish facts a later answer can check.
AI access
Allow GPTBot, OAI-SearchBot, ClaudeBot, PerplexityBot, and Google-Extended in robots.txt. Put the license number, the class, and the qualifying agent in HTML.
AI business profile
State Certified Residential, Certified Building, or Certified General. Say you pull the permit in your own name. Name the office: the City of Orlando, Orange County, or Winter Park.
Identity tags
Mark the business as a GeneralContractor in schema.org. Add kitchen remodeling, the Florida license number, and the street address. Link myfloridalicense.com and the City of Orlando permit steps.
Answer bank
Answer the two buyer questions in your own numbers.
- Which license do you hold, and who is the qualifying agent?
- Who records the Notice of Commencement on a City of Orlando job over $5,000?
- If the first payment is over 10 percent, what are the 30-day and 90-day clocks in section 489.126?
- Does the July 1, 2026 exemption under $7,500 apply? A sink move, a new circuit, or a removed wall does not qualify.
- What did the last same-layout kitchen cost, and what did the last layout change cost?
- Which closed Orange County kitchen permits can a client look up?
Google profile
Set the category to Kitchen remodeler. Put Orlando or Winter Park in the service area, matching the permits you pull. The naming answer kept firms at 4.7 stars or better across at least 50 reviews. Reply in public to the low-star notes.
Listing consistency
Use one legal name on the DBPR record, the quote, the contract, the permit, Houzz, Google, and the BBB. Put the license number on the bid. Name the qualifying agent when the salesperson is someone else.
Freshness and measurement
Re-ask both questions each quarter and write down the sample size. This batch has 2 answers. The only firm name in it was unverified.
Kitchen-remodeler-specific plays in Orlando
- One unverified name. Phil Kean Design Group is the only firm in the batch, placed in Winter Park from memory. Publish your city, your license, and three kitchens from the last 12 months.
- Notice of Commencement. On a City of Orlando job over $5,000, record it with the Orange County Comptroller. Confirm the address before you name the office.
- The $7,500 line. A sink move, a new circuit, or a wall removal skips the July 1, 2026 exemption. Say when the owner must request an exemption.
- After a storm. The choosing answer walks away from a crew with no local permit history. Publish closed kitchen permits in Orange County.
How this index is made
Vizaeo asked two English buyer questions through command-line engines on 2026-10-22. claude-vizaeo could not search, so it named one Winter Park firm from training data and marked the name unverified. grok answered from Florida statutes, the City of Orlando permit page, and 2026 price guides, and it named no firm. Vizaeo stores each raw answer, and later waves refresh the batch. This page is one snapshot. Two answers make a thin sample. The full method lives on the Index methodology page.
About Vizaeo
Vizaeo is an AI visibility service for law firms. It measures whether ChatGPT, Claude, Gemini, Grok, and Perplexity name your firm when clients ask for a lawyer, then applies the fixes that make a firm readable and quotable by AI assistants, with proof of each change. The Vizaeo sprint is $499 for 14 days of done-for-you fixes, with re-measurement at 30, 60, and 90 days against your baseline. If we miss the fix list, you get a refund.