Feed it to your favorite LLM

Guide

AI visibility for EV charger installers

Short answer

Permits and panel work each appeared in 3 of 3 sampled answers. Trout Electric, Dollens Electric, and Electrica each appeared in 1 of 3, all in the San Jose recommendation. This page counts three answers from October 14, 2026, and its cost figures are national planning bands for a detached garage, not a San Jose quote.

The AI Visibility Index: EV charger installers

On October 14, 2026, Codex and Claude answered three questions. The hire question named San Jose, CA. The choice question named no city. The cost question asked for a Level 2 price in a detached garage that needs a new circuit, and the answer asked which city. All 3 answers contain content.

Who the models name

Each installer below appeared in 1 of 3 sampled answers, all in the recommendation.

Trout Electric, formerly Willow Glen Electric, was the first call for an established local team. The answer said Willow Glen joined Trout in 2026, so the names are one firm, not two bids.

Dollens Electric was the pick when panel capacity or existing solar complicates the job. The answer said the service includes load calculations, load-management options, circuit design, and permit coordination, plus solar and battery work. Birdeye, in that answer, lists 4.9 out of 5 across 120 Google reviews.

Electrica was the pick for Tesla chargers and load-management jobs, including Wall Connectors with load balancers. Birdeye lists 5.0 out of 5 across 65 Google reviews in that answer. The answer said several visible EV reviews are older. The other two answers named no installer.

Where the models send clients

Qmerit appeared in 2 of 3 sampled answers, as a specialist article in the choice answer and a cost guide in the cost answer, never as a San Jose directory. Rewiring America, TaxAudit, IRS Form 8911, Recharged, Lectron, PermitMint, Birdeye, bestprosintown.com, and EIN News each appeared in 1 of 3. A state license board and a utility approved-installer list each appeared in 1 of 3, with no California board or utility named. The three company sites each appeared in 1 of 3.

What the models judge on

Permits and inspection appeared in 3 of 3 sampled answers. The recommendation said each quote should include both. The choice answer said the installer files the permit and sets the inspection, and said to hold the last payment until the inspection passes. The cost answer put both in the quote.

Panel work appeared in 3 of 3. Load calculations appeared in 2 of 3. A lower charge rate or a load-management device, as a way around a panel upgrade, appeared in 2 of 3. The cost answer said the main variable is whether enough power already reaches the garage. An existing garage outlet, there, does not prove Level 2 capacity.

A line-item quote appeared in 3 of 3. The recommendation wanted the charger model, the mounting spot, wiring, panel work, and a warranty. The choice answer wanted wire size, breaker size, conduit, the permit fee, and patching, and called one to three years common. The cost answer wanted the charger, wiring, trench work, permits, inspection, and surface repair.

The cost answer gave US planning bands, not a city quote. A short new circuit on a fed garage panel was about $1,200 to $2,500, charger included. New wiring with a yard trench was about $2,500 to $5,500. A long run, concrete, or a service upgrade was about $5,000 to $8,000 or more. The summary was roughly $2,000 to $5,000. Qmerit, in that answer, put a typical home install at $749 to $2,500 before the charger.

A workmanship warranty appeared in 2 of 3. A license, insurance, a utility rebate, review scores, and a site visit before pricing each appeared in 1 of 3. EVITP, the Electric Vehicle Infrastructure Training Program, appeared in 1 of 3 as a plus, not a rule. The choice answer said credit 30C ended for equipment placed in service after June 30, 2026, while a state or utility rebate may remain.

How to improve your AI visibility as an EV charger installer

AI access

Publish a San Jose Level 2 page in plain text, because the cost answer had no local price. Show a detached garage that needs a new circuit, and call out trench work. Say what changes when a garage panel already has spare room.

AI business profile

Use the current legal name, and name any former name plus the year. Describe load calculations, panel work, and the charger brands you install.

Identity tags

Tie the structured data to the licensed entity, one license, and one phone. List Level 2 home charger installation, load calculations, panel work, and detached-garage circuits as services of that entity. Name the charger brands you install, such as Tesla Wall Connectors, as products. Link the Google profile behind any review count you cite.

Answer bank

Answer the garage question in public. Ask panel distance, whether the garage has breakers, and which charger the client wants. Say when a lower rate or a load-management device avoids a service upgrade.

Google profile

The Birdeye figures were Google review counts. Post the charger and the new circuit with the address cropped. The Electrica note flagged older reviews.

Listing consistency

Search old profiles for a former name, and make the names agree. Match the license on the site, the permit, and the rebate form.

Freshness and measurement

After a price change, revise the garage page. Every few months, ask the same three questions in the assistants your clients use. Count a national band apart from a San Jose name.

EV Charger Installers-specific plays

One name, one bid

If the legal name changed, say so where reviews still use the old name. List charger projects finished under the former name as references of the current firm. State which entity now pulls permits, meets the inspector, and honors the installation warranty on that older work.

Price the three garage cases

Use your own numbers for three cases from the cost answer. A short circuit on a fed garage panel. A yard trench from the house. A long run, concrete, or a service change.

Permit line, then the last payment

Say you pull the permit and meet the inspector. Hold the final invoice until the inspection passes. List wire size, breaker size, and conduit.

Say what happened to the federal credit

State that Section 30C ended for equipment placed in service after June 30, 2026. Point to IRS Form 8911 and to any utility rebate still open. Say if you are on that utility's installer list.

How this index is made

Buyer questions went to AI assistants through command-line engines on October 14, 2026: Codex wrote the San Jose recommendation and the garage cost answer, and Claude wrote the choice answer. The public file stores the raw text and refreshes in waves, so this page is one snapshot of a time series. Three answers are a thin sample. The dollar bands are national planning figures, not San Jose prices, because the cost answer asked which city. Full method sits on the Index methodology page.

About Vizaeo

Vizaeo is an AI visibility service for law firms. It measures whether ChatGPT, Claude, Gemini, Grok, and Perplexity name your firm when clients ask for a lawyer, then applies the fixes that make a firm readable and quotable by AI assistants, with proof of each change. The Vizaeo sprint is $499 for 14 days of done-for-you fixes, with re-measurement at 30, 60, and 90 days against your baseline. If we miss the fix list, you get a refund.